labor for 4 zone with 50 gallon indirect
woodrow
Member Posts: 40
what do you pros figure for labor to remove old 80 percent natural draft boiler install new condensing boiler with 5 zones of heat 1 for indirect primary secondary loop all circs repipe returns because they are under sized install venting and combustion air upgrade wiring and replace copper gas line with steel
0
Comments
-
-
no just seeing what other contractors would figure i would figure around 30 man hours but I am not young anymore0
-
Usually between $2K and $50K, depending on political party.
Actually, that is a great way to bypass the "no pricing" ban here on The Wall.
My wife and I just finished a similar project that took us about 40 hours. But those weren't "man" hours; they were man/woman hours.
So much to say, but I'll leave it at that.8.33 lbs./gal. x 60 min./hr. x 20°ΔT = 10,000 BTU's/hour
Two btu per sq ft for degree difference for a slab2 -
And if 6 was 9...0
-
and if you would have listened to her in the first place it would have only been 30 hours!Usually between $2K and $50K, depending on political party.
Actually, that is a great way to bypass the "no pricing" ban here on The Wall.
My wife and I just finished a similar project that took us about 40 hours. But those weren't "man" hours; they were man/woman hours.
So much to say, but I'll leave it at that.6 -
Depends entirely on the setup. Black? Sweat? Press? ZV or circs? A new install of a wall hung mod/con with 2 circs and 4 zone valves like I envision yours to be, maybe 10-15 hours on hammer time or 30-40 on actual time? I'd bid it for 40 personally but expect it to take 20 if all goes well0
-
Thanks for the feed back I was not trying to bypass no pricing gave a price on a replacement they thought it should be around the cost of the materials with no markup I was just trying to get a idea on the labor I would do a combination of black pipe and pro press but have to redo gas piping because its 1/2 copper feeding everything at low pressure have to start over with near boiler piping because its a hack job switching from zone valves to circs also have to move domectic water piping to be able to hang the boiler on the wall0
-
They were right . It should be around the cost of materials . Ask if you can watch while they install the stuff
You didn't get what you didn't pay for and it will never be what you thought it would .
Langans Plumbing & Heating LLC
732-751-1560
Serving most of New Jersey, Eastern Pa .
Consultation, Design & Installation anywhere
Rich McGrath 732-581-38330 -
25 or 6 to 40
-
Does anybody really know what time it is?GBart said:25 or 6 to 4
1
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 916 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements