what do you pros figure for labor to remove old 80 percent natural draft boiler install new condensing boiler with 5 zones of heat 1 for indirect primary secondary loop all circs repipe returns because they are under sized install venting and combustion air upgrade wiring and replace copper gas line with steel

Comments

  • kcopp
    kcopp Member Posts: 4,472
    Are you asking for a price?
    We don't discuss pricing here...
    Canucker
  • woodrow
    woodrow Member Posts: 40
    no just seeing what other contractors would figure i would figure around 30 man hours but I am not young anymore
  • Alan (California Radiant) Forbes
    Alan (California Radiant) Forbes Member Posts: 4,214
    edited October 2018
    Usually between $2K and $50K, depending on political party.

    Actually, that is a great way to bypass the "no pricing" ban here on The Wall.

    My wife and I just finished a similar project that took us about 40 hours. But those weren't "man" hours; they were man/woman hours.

    So much to say, but I'll leave it at that.
    8.33 lbs./gal. x 60 min./hr. x 20°ΔT = 10,000 BTU's/hour

    Two btu per sq ft for degree difference for a slab
    HVACNUTRich_49
  • HVACNUT
    HVACNUT Member Posts: 6,331
    And if 6 was 9...
  • GroundUp
    GroundUp Member Posts: 2,111
    Depends entirely on the setup. Black? Sweat? Press? ZV or circs? A new install of a wall hung mod/con with 2 circs and 4 zone valves like I envision yours to be, maybe 10-15 hours on hammer time or 30-40 on actual time? I'd bid it for 40 personally but expect it to take 20 if all goes well
  • woodrow
    woodrow Member Posts: 40
    Thanks for the feed back I was not trying to bypass no pricing gave a price on a replacement they thought it should be around the cost of the materials with no markup I was just trying to get a idea on the labor I would do a combination of black pipe and pro press but have to redo gas piping because its 1/2 copper feeding everything at low pressure have to start over with near boiler piping because its a hack job switching from zone valves to circs also have to move domectic water piping to be able to hang the boiler on the wall
  • Rich_49
    Rich_49 Member Posts: 2,769
    They were right . It should be around the cost of materials . Ask if you can watch while they install the stuff
    You didn't get what you didn't pay for and it will never be what you thought it would .
    Langans Plumbing & Heating LLC
    732-751-1560
    Serving most of New Jersey, Eastern Pa .
    Consultation, Design & Installation anywhere
    Rich McGrath 732-581-3833
    HVACNUT
  • GBart
    GBart Member Posts: 746
    25 or 6 to 4
  • KC_Jones
    KC_Jones Member Posts: 5,840
    GBart said: