pressure test new system?
Options
ChrisJ
Member Posts: 15,743
Once I'm finally done piping the new boiler in I'm wondering if I should pressure test it or not.
All pipes are really tight and I used Ward cast fittings. Most fittings I used Megaloc dope alone. Any questionable connections like into the old mains I used the Megaloc and blue monster tape. I have king valves and a return valve so testing is possible.
I can setup to do a pressure test but its kind of a pain. What should I do? Take the time to setup and test it with air or just fillerup and light the fire?
All pipes are really tight and I used Ward cast fittings. Most fittings I used Megaloc dope alone. Any questionable connections like into the old mains I used the Megaloc and blue monster tape. I have king valves and a return valve so testing is possible.
I can setup to do a pressure test but its kind of a pain. What should I do? Take the time to setup and test it with air or just fillerup and light the fire?
Single pipe quasi-vapor system. Typical operating pressure 0.14 - 0.43 oz. EcoSteam ES-20 Advanced Control for Residential Steam boilers. Rectorseal Steamaster water treatment
0
Comments
-
testing for leaks
can you just overfill the boiler up to the dry return, and leave it over night. thats how we did the test.--nbc0 -
You could...
pressure test the near boiler piping, if you really wanted to -- but I like nbc's idea.
Do not pressure test the rest of the system -- neither traps nor vents play nicely with pressures much over 5 psi.Br. Jamie, osb
Building superintendent/caretaker, 7200 sq. ft. historic house museum with dependencies in New England0 -
ok
So I guess its safe to say the pros don't usually pressure test the block and near boiler piping?
I just want to try and follow what the pros do. I figure I should be safe that way for the most part.Single pipe quasi-vapor system. Typical operating pressure 0.14 - 0.43 oz. EcoSteam ES-20 Advanced Control for Residential Steam boilers. Rectorseal Steamaster water treatment0 -
The Block
We pressure test each boiler before we install it. We cap the fittings and pressurize it.
Over the years we've installed hundreds of Burnham boilers - they are our favorates. Never found a leaker.
We don't pressurize anything else, unless there is a hot water loop on a steam boiler. We'll pressurize that too.
Wet returns? If they are under the ground we assume they leak.0
This discussion has been closed.
Categories
- All Categories
- 85.7K THE MAIN WALL
- 3K A-C, Heat Pumps & Refrigeration
- 49 Biomass
- 418 Carbon Monoxide Awareness
- 73 Chimneys & Flues
- 1.9K Domestic Hot Water
- 5.2K Gas Heating
- 92 Geothermal
- 150 Indoor-Air Quality
- 3.2K Oil Heating
- 59 Pipe Deterioration
- 850 Plumbing
- 5.8K Radiant Heating
- 372 Solar
- 14.5K Strictly Steam
- 3.2K Thermostats and Controls
- 50 Water Quality
- 39 Industry Classes
- 47 Job Opportunities
- 15 Recall Announcements