Possible to wait??

Options
Cyclist77
Cyclist77 Member Posts: 166

So the new Weil-McClain boiler is sitting in the basement ready to install. The original plan was to install the SS chimney liner. But with this summer being so hot I was thinking of running the boiler for the first heating season using the terracotta lined chimney and doing the liner next Spring.

Thoughts??

Thanks!

Comments

  • pecmsg
    pecmsg Member Posts: 6,284

    So, it’s going to be hot for the next 90 Days?

    mattmia2EdTheHeaterMan
  • HVACNUT
    HVACNUT Member Posts: 6,860

    Someday Never Comes. John Fogerty wrote a song about it.

    EdTheHeaterManIntplm.
  • EdTheHeaterMan
    EdTheHeaterMan Member Posts: 10,765

    I was thinking the same thing @pecmsg. You know… it was hot last summer too. Do you think it will be hot next summer?

    As far as a terracotta lined chimney is concerned I have never seen a perfect terracotta tile completely vanish within one winter season of condensing flue gas problems. An of course if you are using the Weil McLain model 94 commercial steam boiler and the flue tiles are properly sized for the firing rate, you may be able to use that liner for years.

    What Weil McLain boiler is already in your basement?

    Edward Young Retired

    After you make that expensive repair and you still have the same problem, What will you check next?

  • EBEBRATT-Ed
    EBEBRATT-Ed Member Posts: 18,227

    What does being hot have to do with the flue liner?

    EdTheHeaterManIntplm.
  • ethicalpaul
    ethicalpaul Member Posts: 7,762

    My house went 100 years before I put in a SS liner so I think you're OK

    NJ Steam Homeowner.
    Free NJ and remote steam advice: https://heatinghelp.com/find-a-contractor/detail/new-jersey-steam-help/
    See my sight glass boiler videos: https://bit.ly/3sZW1el

    PC7060Intplm.
  • Cyclist77
    Cyclist77 Member Posts: 166

    The reason for postponing is the ongoing exterior house staining and cedar siding repair then we will be gone for 2 months. Now maybe when I am back home in October we could do the install? Or just wait until next spring.

  • hot_rod
    hot_rod Member Posts: 25,333

    I think you went with a standard cast Weil boiler? If so how large is the is the lined chimney. Is it inside or outside the building?

    A small BTU boiler in a large clay flue could lead to some condensation.

    Bob "hot rod" Rohr
    trainer for Caleffi NA
    Living the hydronic dream