Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
C.I. Baseboard Section Assembly Question

ScoutRider
Member Posts: 23
So, I have been salvaging a lot (200 feet) of cast iron baseboard. Most of the ports where push nipples are installed have cleaned up just fine, but in one instance, I have a port with some very slight rust pitting. Any thoughts on how successful using a product like JB Weld might be for that particular section? I would only use it on the pitted surface where the nipple goes, and pipe dope on the other side so I can disassemble if needed.
Thanks!
Thanks!
0
Comments
-
Use RTV.Bob Boan
You can choose to do what you want, but you cannot choose the consequences.0
Categories
- All Categories
- 86.9K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 57 Biomass
- 425 Carbon Monoxide Awareness
- 109 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.7K Gas Heating
- 105 Geothermal
- 160 Indoor-Air Quality
- 3.6K Oil Heating
- 70 Pipe Deterioration
- 975 Plumbing
- 6.3K Radiant Heating
- 386 Solar
- 15.4K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 44 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements