C.I. Baseboard Section Assembly Question
ScoutRider
Member Posts: 23
So, I have been salvaging a lot (200 feet) of cast iron baseboard. Most of the ports where push nipples are installed have cleaned up just fine, but in one instance, I have a port with some very slight rust pitting. Any thoughts on how successful using a product like JB Weld might be for that particular section? I would only use it on the pitted surface where the nipple goes, and pipe dope on the other side so I can disassemble if needed.
Thanks!
Thanks!
0
Comments
-
Use RTV.Bob Boan
You can choose to do what you want, but you cannot choose the consequences.0
Categories
- All Categories
- 86.5K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 423 Carbon Monoxide Awareness
- 95 Chimneys & Flues
- 2K Domestic Hot Water
- 5.5K Gas Heating
- 101 Geothermal
- 156 Indoor-Air Quality
- 3.5K Oil Heating
- 64 Pipe Deterioration
- 927 Plumbing
- 6.1K Radiant Heating
- 384 Solar
- 15.1K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 48 Job Opportunities
- 17 Recall Announcements