New Yorker CG D Gas Boiler

Manigs
Member Posts: 1
in Gas Heating
I have a New Yorker CG D gas boiler. Installed by a licensed plumber and works great. recently an engineer inspected my house and noted that my base clearance was insufficient. He said I needed 18 inches clearance from the floor at the base of the unit. How is that possible? My unit sits on 4 inch blocks and works fine. Is he correct?
0
Comments
-
-
What @Ironman said is correct and is the only reason I would think it would need to be raised. Certainly hope it is not mounted on anything combustable0
-
Send a picture so we can suggest something for you.0
Categories
- 81.2K THE MAIN WALL
- 2.5K A-C, Heat Pumps & Refrigeration
- 37 Biomass
- 394 Carbon Monoxide Awareness
- 2.7K Controls
- 1.4K Domestic Hot Water
- 3.8K Gas Heating
- 101 Geothermal
- 133 Indoor-Air Quality
- 2.4K Oil Heating
- 32 Pipe Deterioration
- 580 Plumbing
- 4.3K Radiant Heating
- 334 Solar
- 12.3K Strictly Steam
- 38 Water Quality
- 11 Industry Classes
- 51 Job Opportunities
- 8 Recall Announcements