Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
New Yorker CG D Gas Boiler
Manigs
Member Posts: 1
in Gas Heating
I have a New Yorker CG D gas boiler. Installed by a licensed plumber and works great. recently an engineer inspected my house and noted that my base clearance was insufficient. He said I needed 18 inches clearance from the floor at the base of the unit. How is that possible? My unit sits on 4 inch blocks and works fine. Is he correct?
0
Comments
-
-
What @Ironman said is correct and is the only reason I would think it would need to be raised. Certainly hope it is not mounted on anything combustable0
-
Send a picture so we can suggest something for you.0
Categories
- All Categories
- 85.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 55 Biomass
- 424 Carbon Monoxide Awareness
- 72 Chimneys & Flues
- 1.9K Domestic Hot Water
- 5.2K Gas Heating
- 129 Geothermal
- 160 Indoor-Air Quality
- 3.3K Oil Heating
- 60 Pipe Deterioration
- 878 Plumbing
- 5.9K Radiant Heating
- 375 Solar
- 14.6K Strictly Steam
- 3.2K Thermostats and Controls
- 58 Water Quality
- 49 Industry Classes
- 89 Job Opportunities
- 28 Recall Announcements