Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
New Yorker CG D Gas Boiler

Manigs
Member Posts: 1
in Gas Heating
I have a New Yorker CG D gas boiler. Installed by a licensed plumber and works great. recently an engineer inspected my house and noted that my base clearance was insufficient. He said I needed 18 inches clearance from the floor at the base of the unit. How is that possible? My unit sits on 4 inch blocks and works fine. Is he correct?
0
Comments
-
-
What @Ironman said is correct and is the only reason I would think it would need to be raised. Certainly hope it is not mounted on anything combustable0
-
Send a picture so we can suggest something for you.0
Categories
- 121.3K All Categories
- 84K THE MAIN WALL
- 2.9K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 417 Carbon Monoxide Awareness
- 40 Chimneys & Flues
- 1.7K Domestic Hot Water
- 4.7K Gas Heating
- 119 Geothermal
- 155 Indoor-Air Quality
- 3K Oil Heating
- 56 Pipe Deterioration
- 768 Plumbing
- 5.4K Radiant Heating
- 362 Solar
- 14K Strictly Steam
- 3K Thermostats and Controls
- 51 Water Quality
- 38 Industry Classes
- 73 Job Opportunities
- 17 Recall Announcements