One year old boiler repiped

All 1 1/4" For header & N.B.P....Building heating on 10 ounces of Steam Vapor...Mad Dog
Comments
-
Wanted to use other tapping as well and keep it all 3" but was going to do more damage backing it out. Mad Dog
1 -
-
that's an interesting way to do a drop header.
is "williamson" a weil painted green?
0 -
Yes...Unlike most installers, I like to do every boiler a little different. When I have a system with a lot of banging & Wet Steam, I go as HIGH as possible to roll it around & dry it out. Mad Dog
5 -
Yes..it is made by WM...vg boiler with 3" Tappings which is nice. Mad Dog
3 -
-
@Mad Dog_2 Why the extra drip off the header?
Trying to squeeze the best out of a Weil-McLain JB-5 running a 1912 1 pipe system.1 -
Its hard to see, but there is an 1 1/4" counter flow radiator branch that disappears in to a bad corner. I didn't want issues with it, so I dripped it. Mad Dog
3 -
-
Awww Shucks....Thank you....I can't help it...there is no other way for me...Mad Dog
1 -
Love the high header. How did you find this job? System must have had bad symptoms for HO to seek a solution after just 1 year.
0 -
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 54 Biomass
- 423 Carbon Monoxide Awareness
- 101 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 102 Geothermal
- 158 Indoor-Air Quality
- 3.5K Oil Heating
- 66 Pipe Deterioration
- 934 Plumbing
- 6.2K Radiant Heating
- 384 Solar
- 15.3K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements