Sweating a coupling from the inside
replacing a hydronic baseboard unit and need to raise the vertical 3/4 feed pipe coming through the ceramic tile floor.
after trimming back the riser to match the element height, the coupling will clear the tile floor by 1/8 of an inch.
Im not confident enough in my skills to sweat this without being able to look at the joint.If I sweat the coupling to the riser first, do you think it possible to feed the solder to the inside of the coupling?
A propress coupling is too long.
https://us.v-cdn.net/5021738/uploads/11JJX2TVQHAW/img-6425.jpeg