hot_rod
hot_rod Member Posts: 22,143
Bob "hot rod" Rohr
trainer for Caleffi NA
Living the hydronic dream
Rich_49IronmanSolid_Fuel_Man

Comments

  • Larry Weingarten
    Larry Weingarten Member Posts: 3,293
    Options
    Beats a wire brush! I do hope it never makes it to Walmart though. Imagine that in the hands of an unhappy teen! :o

    Yours, Larry
  • STEVEusaPA
    STEVEusaPA Member Posts: 6,506
    Options
    What kinda dough we talking...?
    steve
  • Solid_Fuel_Man
    Solid_Fuel_Man Member Posts: 2,646
    Options
    I need that for my '59 Ford!
    Serving Northern Maine HVAC & Controls. I burn wood, it smells good!
  • 1Matthias
    1Matthias Member Posts: 148
    Options

    What kinda dough we talking...?

    If you have to ask, you can't afford it. The 50W version is about $53K ($53,000!), so the 1000W version in the video probably has an even more nosebleed-inducing price.
  • Gordy
    Gordy Member Posts: 9,546
    Options
    Big bucks for one that will do anything meaningful......

  • 1Matthias
    1Matthias Member Posts: 148
    Options
    Yep. Optics are really bloody expensive.
  • SuperJ
    SuperJ Member Posts: 609
    Options
    I bet it would make a great shaver.
    Solid_Fuel_Man1Matthias
  • STEVEusaPA
    STEVEusaPA Member Posts: 6,506
    edited November 2018
    Options
    1Matthias said:

    What kinda dough we talking...?

    If you have to ask, you can't afford it. The 50W version is about $53K ($53,000!), so the 1000W version in the video probably has an even more nosebleed-inducing price.
    Well let's all chip in!! We'll pass it around, take turns...lol ;)
    steve
    1MatthiasSolid_Fuel_Man
  • Gordy
    Gordy Member Posts: 9,546
    Options
    Still some conventional prep work after the laser strip.
  • Solid_Fuel_Man
    Solid_Fuel_Man Member Posts: 2,646
    edited November 2018
    Options
    @STEVEusaPA ok! I'll post my "$100" how long do I get to keep it? :#
    Serving Northern Maine HVAC & Controls. I burn wood, it smells good!
  • Gordy
    Gordy Member Posts: 9,546
    Options
    Not as long as it will take to round up 85k :D
    Solid_Fuel_Man
  • Gordy
    Gordy Member Posts: 9,546
    Options
    I see some future possibilities in bridge work when repainting steel beams. The old paint is lead base from pre 75 ish. The painters go through a lot to contain the lead, and sand, during sand blasting the old paint off. Then they have to dispose of it.

    However this method would still involve containing the fumes from the paint burning. I would think a vacuum system with filtration would be a little easier than tarps making a containment under a bridge. Then retrieve the spent sand, and paint from tarps on the ground.


    Solid_Fuel_Man
  • Gordy
    Gordy Member Posts: 9,546
    Options
    I’d like to know maintenance costs for this. How long before things need replaced at what cost.....duty cycle also. I’m quite sure you just can’t pull the trigger, and run for long periods.