Embassy Industries Onex Boiler FILL issue
Options
dazonex
Member Posts: 2
in Gas Heating
I have an Embassy industries Onex Boiler and the screen says FILL. i cant seem to get the boiler started. the psi is correct and the boiler is filled with water.
0
Comments
-
If the boiler....
is filled and pressurized w/ water and you are still getting the fill readout then the pressure sensor is plugged w/ junk. I have run into this a number of times in the last 3 months on these boilers I have in the field. You can do 3 things. Jump out the sensor temporarily... replace it or clean it out1 -
I had the FILL code on my Onex Boiler and it turned out to be the pressure sensor switch that was indeed "plugged with junk" It was a simple fix after I knew what the problem was. I talked with 4 to 5 plumbing experts and not one suggested the pressure switch. kcopp nailed it.0
-
Categories
- All Categories
- 87.1K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 59 Biomass
- 427 Carbon Monoxide Awareness
- 117 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.7K Gas Heating
- 111 Geothermal
- 163 Indoor-Air Quality
- 3.7K Oil Heating
- 72 Pipe Deterioration
- 1K Plumbing
- 6.4K Radiant Heating
- 393 Solar
- 15.5K Strictly Steam
- 3.4K Thermostats and Controls
- 55 Water Quality
- 51 Industry Classes
- 49 Job Opportunities
- 18 Recall Announcements