Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

Pro Pal Purge Tee

Options
Triangle PT110 tied into a secondary header using Webstone 58664 Pro-Pal purge tee.
With ball valve open between the closely space tees, the boiler water only seems to go directly back to boiler causing it to go off on high limit. With ball valve closed, system works but fine, but defeats the idea of primary/secondary closely spaced tees. About a foot of straight pipe going in and out of purge tee. Has anyone else experience this? Any Fix? I asked at Webstone but did not received a responce yet.

Comments

  • RobG
    RobG Member Posts: 1,850
    Options
    Can you post some photos of the piping?

    Rob
  • Harvey Ramer
    Harvey Ramer Member Posts: 2,239
    Options
    If your piping and circulator placement is normal, the system circle is probably not running.

    What Rob said, pics please.

    Harvey
  • JoeyG_2
    JoeyG_2 Member Posts: 14
    Options
    Yeah, What @RobG‌ and @Harvey Ramer‌ "‌said.. Show us your pics. I'm interested now. That webstone Pri/Sec valve is pretty cool right. I think that Webstone is 1" X1" . Sounds like the secondary circ. is D.O.A./M.I.A. or taking a nap. It's not the newest one from Hasbro, is it. I posted a pic below.
    Joey G
  • kcopp
    kcopp Member Posts: 4,432
    Options
    It may be a wiring issue. Circs on a new boiler being DOA is very rare.