Wire mesh supports
Options
hot_rod
Member Posts: 27,472
is what they call them around here. Find them at any steel supplier that has rebar or mesh, generally. Not usually found at home centers or lumber yards, more of a steel supplier.
Go with the continous rail bar chairs. They support mesh better than the single chairs, and don't sink into the foam insulation like the small ones. they come in a variety of sizes 1/2" increments usually 3 feet long.
Under mesh they need to be every 3-4 feet to do much good or the mesh just sags down between them. it takes more than you might expect to hold all that mesh up where you want it.
Tie the mesh, chair, and tube all together with the ties. this assures the tube stays up, the chair doesn't tip over, and the mesh stays in the pour without floating.
Keep in mind the chair dimension if you score the concrete with a cutter afterward!
Slabs do perform much better with the tube up in the middle as opposed to the bottom of the pour. it's worth the time to do this.
Stay away from rocks or bricks to hold mesh up :)
hr
Go with the continous rail bar chairs. They support mesh better than the single chairs, and don't sink into the foam insulation like the small ones. they come in a variety of sizes 1/2" increments usually 3 feet long.
Under mesh they need to be every 3-4 feet to do much good or the mesh just sags down between them. it takes more than you might expect to hold all that mesh up where you want it.
Tie the mesh, chair, and tube all together with the ties. this assures the tube stays up, the chair doesn't tip over, and the mesh stays in the pour without floating.
Keep in mind the chair dimension if you score the concrete with a cutter afterward!
Slabs do perform much better with the tube up in the middle as opposed to the bottom of the pour. it's worth the time to do this.
Stay away from rocks or bricks to hold mesh up :)
hr
Bob "hot rod" Rohr
trainer for Caleffi NA
Living the hydronic dream
trainer for Caleffi NA
Living the hydronic dream
0
Comments
-
I know I have seen supports to install under wire mesh for concrete overpour radiant installations where as to place the tubing in the middle of the slab when tied to the mesh. Does anyone know the name and a website where I might find these?
Thanks0 -
Rebar and mesh CHAIRS
At least in these parts, what you're probably looking for are 'chairs' - searching 'rebar chairs' finds various kinds of mesh, wire, and rebar supports.
Here's one:
http://www.durajoint.com/content/RebarChairs.aspx
Good luck!
Vbob0
This discussion has been closed.
Categories
- All Categories
- 87.6K THE MAIN WALL
- 3.3K A-C, Heat Pumps & Refrigeration
- 59 Biomass
- 430 Carbon Monoxide Awareness
- 124 Chimneys & Flues
- 2.2K Domestic Hot Water
- 5.9K Gas Heating
- 120 Geothermal
- 168 Indoor-Air Quality
- 3.8K Oil Heating
- 78 Pipe Deterioration
- 1K Plumbing
- 6.6K Radiant Heating
- 394 Solar
- 16K Strictly Steam
- 3.5K Thermostats and Controls
- 56 Water Quality
- 51 Industry Classes
- 50 Job Opportunities
- 18 Recall Announcements