Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Vapor Steam contractor in NW Connecticut
Jamie Hall
Member Posts: 24,648
I am looking for a contractor, or a recommendation of a contractor, to install a second boiler and some controls on a vapor steam heating system in northwestern Connecticut. The job is moderately straightforward, thanks to all the excellent help from the folks on (off?) the Wall -- existing system; additional boiler (about 750 sq. ft. EDR rating) with controls in lead/lag configuration with existing boiler (same size); thermostat controlled cut off valve on portion of system which hasn't been in use for 30 years but is now needed (but only some of the time, which is why the thermostat controlled cut off valve and two boilers); a couple of replacement radiators; repair of one known leak; ferreting out other leaks if they appear; and additional piping from the fuel tank...
It's getting cold out... and in!
If any one is interested, or knows of a good contractor in NW Connecticut who they could recommend, please post here or email me direct (jchnhtfd@att.net).
Thank you in advance!
It's getting cold out... and in!
If any one is interested, or knows of a good contractor in NW Connecticut who they could recommend, please post here or email me direct (jchnhtfd@att.net).
Thank you in advance!
Br. Jamie, osb
Building superintendent/caretaker, 7200 sq. ft. historic house museum with dependencies in New England
Building superintendent/caretaker, 7200 sq. ft. historic house museum with dependencies in New England
0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 913 Plumbing
- 6K Radiant Heating
- 380 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements