Put these together today with plans to install on each side of my wet return. I wanted to install the 1st one at the initial part where the copper connects to the black pipe but there isn't enough space available. Next year I may move it to the very beginning of where the two mains drop down and connect at the beginning of the wet return. Thoughts?
0
Comments
-
Hopefully it will allow me to clean out the long line that is against the floor where I am sure most of the sludge settles0
-
@JUGHNE @EBEBRATT-Ed any recommendation?0
-
Weren't you looking at the single valve with the hose bib build into the side of it?
It would need less length of pipe to install.
Or put it closer to the boiler in the copper line under the cover laying on the floor.
Does that copper go up into the Hartford Loop connection?
If so I would put it in that vertical riser.0 -
JUGHNE said:Weren't you looking at the single valve with the hose bib build into the side of it? It would need less length of pipe to install. Or put it closer to the boiler in the copper line under the cover laying on the floor. Does that copper go up into the Hartford Loop connection? If so I would put it in that vertical riser.0
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 88 Chimneys & Flues
- 2K Domestic Hot Water
- 5.3K Gas Heating
- 98 Geothermal
- 155 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 909 Plumbing
- 6K Radiant Heating
- 380 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements