Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

Replacement for the LightRay Furnace

Ironman
Ironman Member Posts: 7,556
edited February 2017 in THE MAIN WALL
This is where we started (as previously posted in another thread):


And this is where we are now:


Along the way:





This system was a combination of a 120+ year old one and two pipe air vent system. One of the returns would not hold air pressure and was inaccessible; so, we did a modification and eliminated that return and one first floor rad and re-worked the branch feeding the other rad's to drain counter Flow:



Two Big Mouth vents clear the 80' 2 1/2" main in less than three minutes.









Bob Boan
You can choose to do what you want, but you cannot choose the consequences.
Dan Foley

Comments

  • Danny Scully
    Danny Scully Member Posts: 1,440
    Well I'm jealous. Nice work as always @Ironman. I like the bending temper!
    Ironman
  • SeanBeans
    SeanBeans Member Posts: 520
    So this is the exact same boiler as the lennox GSB?

    And it worked well with the 2 2inch risers?
  • Ironman
    Ironman Member Posts: 7,556
    edited February 2017
    SeanBeans said:

    So this is the exact same boiler as the lennox GSB?



    And it worked well with the 2 2inch risers?

    Yes and yes.

    Bob Boan
    You can choose to do what you want, but you cannot choose the consequences.
  • JUGHNE
    JUGHNE Member Posts: 11,279
    edited February 2017
    225,000 BTUH input with 7 sections?
    And a 3" header?
  • Ironman
    Ironman Member Posts: 7,556
    JUGHNE said:

    225,000 BTUH input with 7 sections?
    And a 3" header?

    Yes.

    Bob Boan
    You can choose to do what you want, but you cannot choose the consequences.
    JUGHNE