Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

my money worries are over! Entran 2 settlement check arrived today

hot_rod
hot_rod Member Posts: 23,418
edited July 2016 in THE MAIN WALL
The theory was the unclaimed funds would be split among all that filed at the end of the time period. At one point near the end several hundred million dollars was unclaimed!

Attorneys for the case were frantically calling contractors to get more homeowners to file near the end of the time period. Maybe they got paid on the % of claims filed :)

I had visions of tens if not hundreds of thousands of $$ landing in my lap?

Oh well back to the lottery.


Bob "hot rod" Rohr
trainer for Caleffi NA
Living the hydronic dream
SWEIkcopp

Comments

  • BobC
    BobC Member Posts: 5,502
    The only ones that come out ahead in a class action suit are the lawyers, everybody else gets pennies.

    Bob
    Smith G8-3 with EZ Gas @ 90,000 BTU, Single pipe steam
    Vaporstat with a 12oz cut-out and 4oz cut-in
    3PSI gauge
    HatterasguyHillykcopp
  • hot_rod
    hot_rod Member Posts: 23,418
    Unless I had 20,000 square feet of radiant in my home and got in on the 10- 20 bucks a sq settlement number.

    Imagine the massive snowmelt that many of the ski resorts owned the may have applied at the end. Vail keeps track of their snow melted streets in acres not square feet.

    I had about 35 square feet in my bathroom.

    The remaining money after all the claims were paid is what got split, after I got the $3500.00.
    Bob "hot rod" Rohr
    trainer for Caleffi NA
    Living the hydronic dream
  • hot_rod
    hot_rod Member Posts: 23,418

    hot rod said:


    The remaining money after all the claims were paid is what got split, after I got the $3500.00.

    Welllllll............you didn't mention that little tidbit.

    $3500. isn't exactly chump change.
    true, but it is under a $5,000.00 tile floor, shower and tile walls. At least that was the cost of the mud/tile job 20 years ago.

    Bob "hot rod" Rohr
    trainer for Caleffi NA
    Living the hydronic dream
    kcopp