Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
got a little more done this weekend. wife still mad.....
TomM
Posts: 233
see pics. before/after. comments and criticism welcome.
There was an error rendering this rich post.
0
Comments
-
With such nice piping work
why is your wife mad?All Steamed Up, Inc.
Towson, MD, USA
Steam, Vapor & Hot-Water Heating Specialists
Oil & Gas Burner Service
Consulting0 -
She'll get over it
When the house is warm and toasty.
She may not appreciate the artistic beauty of the piping work you have been doing, but I do!Dave in Quad Cities, America
Weil-McLain 680 with Riello 2-stage burner, December 2012. Firing rate=375MBH Low, 690MBH Hi.
System = Early Dunham 2-pipe Vacuo-Vapor (inlet and outlet both at bottom of radiators) Traps are Dunham #2 rebuilt w. Barnes-Jones Cage Units, Dunham-Bush 1E, Mepco 1E, and Armstrong TS-2. All valves haveTunstall orifices sized at 8 oz.
Current connected load EDR= 1,259 sq ft, Original system EDR = 2,100 sq ft Vaporstat, 13 oz cutout, 4 oz cutin - Temp. control Tekmar 279.
http://grandviewdavenport.com0 -
thanks guys
thanks guys!
i decided to go all out and use 30" risers. I was disappointed that the boiler tappings were tapped slightly out of parallel, which made for some necessary finesse to get everything lined up and square. I made sure all the USA fittings are in the front, and all the import fittings are in the back. :-)
I was suprised how everything came together pretty easy with proper planning. I only needed one custom threaded length, the pipe connecting the two risers. I could have probably done it with a stock fitting though.
Having a machining background, i'm used to everything lining up exactly perfect. Not so with pipe. It takes a cool hand to get everything right. and plenty of unions helps too. It's modular.
My goal is to maximize floorspace, and have everything in the most compact configuration possible. With 4 kids, all i got left is the basement.
Piping ain't easy!There was an error rendering this rich post.
0 -
Wife shouldn't be mad!
She should be celebrating thanksgiving...giving you thanks for supplying her with a much better boiler install...looks great!gwgillplumbingandheating.com
Serving Cleveland's eastern suburbs from Cleveland Heights down to Cuyahoga Falls.0 -
I can keep her busy for you.
Oops. I better not say that to a guy with a big ol' pipe in his hand!Just another DIYer | King of Prussia, PA
1983(?) Peerless G-561-W-S | 3" drop header, CG400-1090, VXT-240 -
Uhhhhhhh ---- No
Well Hap, you just made a set up for about a half a dozen one liners, but I'm gonna resist! I don't wanna be banned from HH.com! ha!Dave in Quad Cities, America
Weil-McLain 680 with Riello 2-stage burner, December 2012. Firing rate=375MBH Low, 690MBH Hi.
System = Early Dunham 2-pipe Vacuo-Vapor (inlet and outlet both at bottom of radiators) Traps are Dunham #2 rebuilt w. Barnes-Jones Cage Units, Dunham-Bush 1E, Mepco 1E, and Armstrong TS-2. All valves haveTunstall orifices sized at 8 oz.
Current connected load EDR= 1,259 sq ft, Original system EDR = 2,100 sq ft Vaporstat, 13 oz cutout, 4 oz cutin - Temp. control Tekmar 279.
http://grandviewdavenport.com0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 89 Chimneys & Flues
- 2K Domestic Hot Water
- 5.3K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 910 Plumbing
- 6K Radiant Heating
- 380 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements