Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Steamed Up Boiler Room

plumb1
Member Posts: 1
Commercail vacuum steam system. Re-located all feed & return lines 4" into wall with no re-design of system. When return lines enter the boiler room they go into an open sump pit in boiler room and then pumps back to boiler.
Customer complaint - boiler room fills with steam and this never happen prior to replacing main trunk feed & return lines.
Customer complaint - boiler room fills with steam and this never happen prior to replacing main trunk feed & return lines.
0
Comments
-
Easy one
BAD traps.0
This discussion has been closed.
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 56 Biomass
- 423 Carbon Monoxide Awareness
- 103 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 103 Geothermal
- 158 Indoor-Air Quality
- 3.5K Oil Heating
- 68 Pipe Deterioration
- 936 Plumbing
- 6.2K Radiant Heating
- 385 Solar
- 15.3K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 18 Recall Announcements