new cast iron smell

Options
Installed new free standing cast iron radiators 2 months ago and they still smell installed on steam boiler, 

Comments

  • nicholas bonham-carter
    nicholas bonham-carter Member Posts: 8,578
    Options
    smelly rads

    what sort of smell is there-chemical, petrochemical, paint, rotten?

    are these newly made or just new to you?

    some smells may come from the rest of the system. --nbc
  • ansky
    ansky Member Posts: 41
    Options
    Gradual

    I had a new cast iron baseboard installed almost a year ago and I still get a little smell but usually only noticeable when the full length of the baseboard is heated. The smell has gradually gotten better since installation..
  • Dave in QCA
    Dave in QCA Member Posts: 1,785
    Options
    Smell will eventually go away

    I installed a large cast iron radiator which I had constructed from 2 salvaged radiators, taken apart an reassembled as one.  I painted it with dark bronze spray paint at the time, in January of 2009.  When connected to steam it made a pretty strong paint off gassing smell.  This subsided within the first week, but was detectable for quite some time.  It was probably close to a year later before there was no detectable odor whatsoever.  However, I have a pretty sensitive nose.  The radiator is located in the entrance hall of a house/apartment conversion.  None of the tenants complained or even commented.

    I have had much shorter "smelly time" with other radiators painted with the same brand and color of paint.
    Dave in Quad Cities, America
    Weil-McLain 680 with Riello 2-stage burner, December 2012. Firing rate=375MBH Low, 690MBH Hi.
    System = Early Dunham 2-pipe Vacuo-Vapor (inlet and outlet both at bottom of radiators) Traps are Dunham #2 rebuilt w. Barnes-Jones Cage Units, Dunham-Bush 1E, Mepco 1E, and Armstrong TS-2. All valves haveTunstall orifices sized at 8 oz.
    Current connected load EDR= 1,259 sq ft, Original system EDR = 2,100 sq ft Vaporstat, 13 oz cutout, 4 oz cutin - Temp. control Tekmar 279.