Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
revised p/s loop
Dave_82
Member Posts: 12
Here is a revised schematic of the proposed repiping of my copper tube boiler. The plumber wants to remove the air vents at the ends of the supply and return manifolds and bridge the manifolds together. Does that make sense?
Also, is the placement of the capped tees for a possible future buffer tank (to decrease shortcycling) seem OK? The shutoff in between would be closed when/if the buffer tank is installed.
Thank you.
Dave
Also, is the placement of the capped tees for a possible future buffer tank (to decrease shortcycling) seem OK? The shutoff in between would be closed when/if the buffer tank is installed.
Thank you.
Dave
0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 916 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements