Came up short
Options
Chris K
Member Posts: 5
Am installing a joist trak radiant floor. We were trying to use up a partial roll of tubing and came up about 3 feet short of reaching the manifold at the end. Should I pull this all down and redo with a full roll or can I get away with putting a coupling in the end to reach the manifold?
If I put a coupling into one loop, should I put a coupling in the second loop so the flow loss will be even or just even the flow with the valves at the manifold. I still need to hit the flow rate of 2.5gpm through the floor and don't know if that coupling will screw things up..
Thanks for any help....
If I put a coupling into one loop, should I put a coupling in the second loop so the flow loss will be even or just even the flow with the valves at the manifold. I still need to hit the flow rate of 2.5gpm through the floor and don't know if that coupling will screw things up..
Thanks for any help....
0
Comments
-
put the coupling in - only leave access to this area if possible incase you ever need to check/recrimp your connection.
0 -
joint
use a compression by compression coupling, heat shrink over it after it has been pressure tested. Fill it up. Have a nice day.
Do not put a joint in the next loop to balance the flow. Use the flow setter on the manufacured manifold to balance flow.0 -
Thanks!! Whole lot easier than pulling all that tubing down again.0 -
you aint kiddin0
This discussion has been closed.
Categories
- All Categories
- 87.3K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 61 Biomass
- 429 Carbon Monoxide Awareness
- 120 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.8K Gas Heating
- 115 Geothermal
- 166 Indoor-Air Quality
- 3.7K Oil Heating
- 77 Pipe Deterioration
- 1K Plumbing
- 6.5K Radiant Heating
- 395 Solar
- 15.7K Strictly Steam
- 3.4K Thermostats and Controls
- 56 Water Quality
- 51 Industry Classes
- 50 Job Opportunities
- 18 Recall Announcements