Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
If our community has helped you, please consider making a contribution to support this website. Thanks!
Heating
Options
GMcD
Member Posts: 477
Wait till it's cured, at least 30 days, and then the heat has to applied slowly so the concrete and the tubing isn't stressed. Let's say your design slab temperature is 85F and you are starting from, say 45F. It may take a couple weeks - start with water at 50F and increase in 5F increments every 3-4 days till you are within 5F of setpoint. Monitor with your slab temperature sensor(s) (you DO have some slab temperature sensors, don't you?) so you can see if you can increase the temperature at a faster rate. That's my conservative P.Eng recommendation that is safe. Others can go faster but the slab internal temperature must me monitored so you don't have a high differential betweem the heating fluid and the slab.
0
Comments
-
Heating
How soon can I turn radiant heat on a 6-inch thick reinforced concrete slap and at what temperature?
TX
0
This discussion has been closed.
Categories
- All Categories
- 87.4K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 61 Biomass
- 429 Carbon Monoxide Awareness
- 120 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.8K Gas Heating
- 115 Geothermal
- 167 Indoor-Air Quality
- 3.7K Oil Heating
- 77 Pipe Deterioration
- 1K Plumbing
- 6.5K Radiant Heating
- 395 Solar
- 15.7K Strictly Steam
- 3.4K Thermostats and Controls
- 56 Water Quality
- 51 Industry Classes
- 50 Job Opportunities
- 18 Recall Announcements