in floor staple up hydronic system

Robert Gould
Member Posts: 3
I've placed pex tubing in my new basement slab and was about to start the staple up job in the joist bays for heating the first floor. I now discovered tar paper in my 1908 house between the fir floor and the 3/4" subfloor. I have read in Dan's book that this would not be a good idea because of the smell that would be created by the heat. Is this a hard and fast rule? What can I do for an alternative? Also, I didn't place o2 barrier pex in the slab because I was going to use an open gas fired stainless steel system. What are my alternative boiler options? Thanks, Rob
0
Comments
-
staple up job
I've placed pex tubing in my new basement slab and was about to start the staple up job in the joist bays for heating the first floor. I now discovered tar paper in my 1908 house between the fir floor and the 3/4" subfloor. I have read in Dan's book that this would not be a good idea because of the smell that would be created by the heat. Is this a hard and fast rule? What can I do for an alternative? Also, I did'nt place o2 barrier pex in the slab because I was going to use an open gas fired stainless steel system. What are my alternative boiler options? Thanks, Rob0 -
non-Barrier?
If you didn't use Barrier PEX in the slab you can either use a copper fin tube boiler or a mod-con with all non-ferrous circulators.
As far as the tar paper, you may not have a problem. Some people have said it's not a problem.
Where'd you get the PEX and who did the design?0
This discussion has been closed.
Categories
- All Categories
- 87.1K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 58 Biomass
- 427 Carbon Monoxide Awareness
- 113 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.7K Gas Heating
- 110 Geothermal
- 161 Indoor-Air Quality
- 3.6K Oil Heating
- 70 Pipe Deterioration
- 996 Plumbing
- 6.3K Radiant Heating
- 391 Solar
- 15.4K Strictly Steam
- 3.4K Thermostats and Controls
- 55 Water Quality
- 44 Industry Classes
- 48 Job Opportunities
- 18 Recall Announcements