Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

A job fit for a buderus (or three)

Options
Your attention to detail and craftsmanship is impressive. Thanks for the pictures and support!

Comments

  • Ray Landry_2
    Ray Landry_2 Member Posts: 114
    Options


    I've got quite the photo collection considering I haven't had a computer in 8 months! Heres an install in a church i did back in november. It was 2 GB 142/60's, a g234, and a 32 gallon indirect all controlled by a tekmar 265 staging control. we ripped out the old beast which was 40 percent oversized and got these three up and running in a loonnnggg 4 days. looking back on it I wish that I had done the header near the pumps in steel instead of propress, probably wouldve saved the hassel of getting the 2 1/2 jaws and fittings....
  • Weezbo
    Weezbo Member Posts: 6,232
    Options
    Yup. Thats The Caleffi *~/:)

    Yeah man :) well,it Does Look Good :)took a lot of right effort :)Thanks for the gleam....
This discussion has been closed.