Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
A job fit for a buderus (or three)
Joe@buderus_2
Member Posts: 302
Your attention to detail and craftsmanship is impressive. Thanks for the pictures and support!
0
Comments
-
I've got quite the photo collection considering I haven't had a computer in 8 months! Heres an install in a church i did back in november. It was 2 GB 142/60's, a g234, and a 32 gallon indirect all controlled by a tekmar 265 staging control. we ripped out the old beast which was 40 percent oversized and got these three up and running in a loonnnggg 4 days. looking back on it I wish that I had done the header near the pumps in steel instead of propress, probably wouldve saved the hassel of getting the 2 1/2 jaws and fittings....0 -
Yup. Thats The Caleffi *~/:)
Yeah man well,it Does Look Good :)took a lot of right effort :)Thanks for the gleam....0
This discussion has been closed.
Categories
- All Categories
- 86.6K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 54 Biomass
- 423 Carbon Monoxide Awareness
- 98 Chimneys & Flues
- 2K Domestic Hot Water
- 5.5K Gas Heating
- 101 Geothermal
- 157 Indoor-Air Quality
- 3.5K Oil Heating
- 64 Pipe Deterioration
- 931 Plumbing
- 6.2K Radiant Heating
- 384 Solar
- 15.2K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 42 Industry Classes
- 48 Job Opportunities
- 17 Recall Announcements