Your attention to detail and craftsmanship is impressive. Thanks for the pictures and support!
0
Comments
-
I've got quite the photo collection considering I haven't had a computer in 8 months! Heres an install in a church i did back in november. It was 2 GB 142/60's, a g234, and a 32 gallon indirect all controlled by a tekmar 265 staging control. we ripped out the old beast which was 40 percent oversized and got these three up and running in a loonnnggg 4 days. looking back on it I wish that I had done the header near the pumps in steel instead of propress, probably wouldve saved the hassel of getting the 2 1/2 jaws and fittings....0 -
Yup. Thats The Caleffi *~/:)
Yeah man well,it Does Look Good :)took a lot of right effort :)Thanks for the gleam....0
This discussion has been closed.
Categories
- All Categories
- 85.7K THE MAIN WALL
- 3K A-C, Heat Pumps & Refrigeration
- 49 Biomass
- 424 Carbon Monoxide Awareness
- 72 Chimneys & Flues
- 1.9K Domestic Hot Water
- 5.2K Gas Heating
- 92 Geothermal
- 149 Indoor-Air Quality
- 3.2K Oil Heating
- 59 Pipe Deterioration
- 847 Plumbing
- 5.8K Radiant Heating
- 372 Solar
- 14.5K Strictly Steam
- 3.2K Thermostats and Controls
- 50 Water Quality
- 48 Industry Classes
- 47 Job Opportunities
- 15 Recall Announcements