Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
If our community has helped you, please consider making a contribution to support this website. Thanks!
A job fit for a buderus (or three)
Options
Joe@buderus_2
Member Posts: 302
Your attention to detail and craftsmanship is impressive. Thanks for the pictures and support!
0
Comments
-
I've got quite the photo collection considering I haven't had a computer in 8 months! Heres an install in a church i did back in november. It was 2 GB 142/60's, a g234, and a 32 gallon indirect all controlled by a tekmar 265 staging control. we ripped out the old beast which was 40 percent oversized and got these three up and running in a loonnnggg 4 days. looking back on it I wish that I had done the header near the pumps in steel instead of propress, probably wouldve saved the hassel of getting the 2 1/2 jaws and fittings....0 -
Yup. Thats The Caleffi *~/:)
Yeah man
well,it Does Look Good :)took a lot of right effort :)Thanks for the gleam.... 0
This discussion has been closed.
Categories
- All Categories
- 87.3K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 61 Biomass
- 429 Carbon Monoxide Awareness
- 120 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.8K Gas Heating
- 115 Geothermal
- 166 Indoor-Air Quality
- 3.7K Oil Heating
- 77 Pipe Deterioration
- 1K Plumbing
- 6.5K Radiant Heating
- 395 Solar
- 15.7K Strictly Steam
- 3.4K Thermostats and Controls
- 56 Water Quality
- 51 Industry Classes
- 50 Job Opportunities
- 18 Recall Announcements