Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

New boiler with custom header

jim f_3
jim f_3 Member Posts: 10
here is an install in progress with 2 cgi-6 w/ outdoor reset controls on a primary secondary piping design. the house is located on long island sound consisting of four trane v/s hydrosystems and eac's which have multiple zones. also a stearling hydronic heater for garage
and a 120 gallon indirect piped in 2" black. four XL14i condensers.
jim f.
tri-city heating and cooling

Comments

  • David Sutton_6
    David Sutton_6 Member Posts: 1,079
    nice!

    Thats a outstanding job Jim!...David
  • bob young
    bob young Member Posts: 2,177
    that is NICE

    That is one serious pipefitting job,Jimbo. i love the prefabbed headers. can't wait 'till i get an opportunity to use them also. all i can say is ----NICE. class work
  • Dennis
    Dennis Member Posts: 124
    Wow, Jim

    This looks great, these folks have the greatest mechanical room I have ever seen. I assume this house is not big enough for them, with all the extra spaces for zone pumps.
    I think these folks are going to fund you retirement, I love customers like these.

    There was an error rendering this rich post.

  • jim f_3
    jim f_3 Member Posts: 10


    next time i go back i will take more pictures of the system and view of long island sound.
This discussion has been closed.