Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
3/4 Kitec feeding 2nd floor panelrads
Solarstar
Member Posts: 82
wall is apart and I need to feed the second floor for future panelrads. Will the 3/4 kitec carry about the 20K btus Max required for this. I think kitec pipe is a full 3/4 I.D. thanks Paul
0
Comments
-
3/4\" will ...
work but so will 5/8" (id that is)...1/2 would work if you had only 15k...kpc
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"0 -
1/2\"
will move 20,000 at a 20 degree delta t (2 gpm) 2.6 fps with 5.5 feet of head per 100 feet of tube.
5/8" would provide a little breathing room.
hot rod
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"0 -
this is relevant information for Sam...
just to run the idea by him...
bump.0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 64 Pipe Deterioration
- 918 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements