Buffertank,direct vent boiler & tekmar
KBP&H_3
Member Posts: 67
Has anyone done this setup on a baseboard system,, Honeywell Smile website lists all going into buffer tank,, after boiler,,, It would make sense to put the boiler first, pipe out to the buffer tank, and then the heating zones, putting the temp sensor for water temp after the buffer tank,,. W/ the pre and post purge on direct vent--- anyone have an idea for optimal boiler run time or tank sizing??? IE 100,000BTU out and 40 or 50 gallon tank???,,,
0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 916 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements