Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
installig my first munchkin

randy_18
Member Posts: 1
I have heard many mixed opinions about the munchkins. I have sold my first one and iam getting ready to install it?
There are two baseboard zones and a super store. I am using the vision one control. Can any body give me some advice making it a proper install? I am looking for a few pointers
There are two baseboard zones and a super store. I am using the vision one control. Can any body give me some advice making it a proper install? I am looking for a few pointers
0
Comments
-
Three things.
Read the installation instructions.
Examine the schematics and near boiler piping diagrams.
Re-read the literature again.
You'll be fine. They are a piece of cake.
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"0 -
Get rid
of that POS barbed (with hole in it) condensate drain fitting. Build a tee with the top open for the vacumn breaker. Make sure that rubber condensate p-trap is not crushed. Put the thing up on a rack to have acess to that trap, they do plug, sometimes. If you set it right on the floor you may be sorry. I like them just below eye level for ease of service
Check all the wiring, I have found loose connections!
Of course you will need a combustion analyzer to properly check, and tune.
Pump 'em on the return and be mindful of the circ required.
Be sure they have a good supply of CLEAN air for combustion. If near a gravel drive or dusty condition pull air from WAY up there
Seal the lid when you are finished with all the adjustments.
Flush and clean them well for a good, healthy, HX life. Check the condition of the fill water, stay away from real hard water that will coat those small HXers. Buy DI or DM water if the jobsite water is questionable!
hot rod
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"0 -
Make shure you locate your make up air far enough away from your exhaust.
Don't use a flat plate concentric.
Don't install make up air and exhaust near a corner.
Install Munchkin on blocks.
Must use primary secondary.
Look at Vision I diagram for piping or DHW.
Must install flow check below boiler pump.
Make sure condensate drains freely.
Check co should be at 110ppm at high fire.
Co2 should be at 9.5% at high fire Nat, 10.5 LP
Any other ? you can email me at summitplumbing@comcast.net
P.S. don't remove plastic barb on condensate drain and make sure you it is open after you make your conection.
Authorized Heat Tranfer Products Sevice Agent0 -
Randy...there is a special tool for rewiring ....
Chuck Shaw had one and i thought ...hmmmm...maybe i should buy one of those ...he then mentioned that they are sold in 10's well...i am un daunted....if you buy one i will buy one too....if a couple others would buy one i am pretty sure i can find homes for 5 altogether...i think they sound like a good tool to have either for a first time installer or a service tech. *~/:)0 -
Hey, Hot Rod
Do you make your racks or do you buy them?
What combustion analyzer do you recommend?0 -
Munchkin stand
check out the MunchPak from PHP at www.phpinc.us
Designed by a clever plumber in Montana
I have also built my own to stack on a buffer tank. I'm happy with my Bachrach 125 analyzer. Nice to have a printer with it also . I keep a analyzer copy, and leave a copy in the job folder.
hot rod
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"0 -
Curious why you said to pump munchkins on the return?
it's an old post but as I'm considering one i'm wondering why this boiler would be different. Or is your preference in general to pump on return rathern than pumping away?
Thanks,
David0 -
About them tools
You can buy them indvidually from newark electronics web site is newark.com tool is know as an extraction tool #94f9674 is there stock # type 11-03-00440 -
Pumping away
Pumping away, refers to the PONC (point of no pressure change). In pri/sec piping, you can still "pump away" from the PONC, while pumping into the boiler. Check the lit for Munchkin
http://www.htproducts.com/literature/lp-61.pdf
or the WM Ultra
http://www.weil-mclain.com/FTP/Ultra 310/UltraBoilerManual.pdf
If you look at the piping diagrams, both are pumping into the the boiler, on the return, to help with flow thru the smaller heat exchange passages, yet still pumping away from the point of no pressure change, the expansion tank and fill valve. Yet another great advantage of pri/sec piping
Hope this helps,
Rebel0 -
I like
pumping on the return because that puts the positive pressure of the circulator facing the pressure switch, and that keeps the pressure switch, set at 10 psi, as far away from tripping as possible. WW
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"0 -
The big three
What I always push when training on our Mod/Con boiler are what I call the big 3-
FLOW
VENTING
CONDENSATE
Those are the items that are invariably the cause of the headaches.
FLOW-Those boilers hold a minimum of water, so it needs to keep moving at a certain pace.
VENTING- You don't want to breathe in what YOU exhaust- neither does the boiler. Watch the terminations.
CONDENSATE-That pipe that comes from beneath the boiler is a drain, and that is exactly what it needs to do-DRAIN.
If you pay close attention to those three items, your Munchkin install should work without incident.0 -
Munchkin install
Pipe the boiler by the instructions with the vison package unless HTP has corrected the instructions in the manual.
Jerry0
This discussion has been closed.
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 56 Biomass
- 423 Carbon Monoxide Awareness
- 104 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 103 Geothermal
- 158 Indoor-Air Quality
- 3.5K Oil Heating
- 68 Pipe Deterioration
- 938 Plumbing
- 6.2K Radiant Heating
- 385 Solar
- 15.3K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 18 Recall Announcements