Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
If our community has helped you, please consider making a contribution to support this website. Thanks!
New Danfoss Panel Install
Options
DH
Member Posts: 21
Have a peek. Installation is not complete yet, but you can get an idea what is being done. The installing contractor only installs Danfoss Panels and refuses to do component installations. Every project he does looks this great! System has a Weil McLain Ultra Boiler, Weil McLain Indirect Tank, Danfoss BFP Panel, 3 - 4WE Panels, 1 BHP Panel, 2 fan coils and an Axiom Glycol fill tank. This Mechanical Contractor refuses to do any other installs without panels. He has over 100 panels installed over the last two years and has never had to go back for service or failure. He truly is a perfectionist.
This system will be connected soon to the Danfoss ECL302 remote communication package and will be monitored and tracked for performance.
This system will be connected soon to the Danfoss ECL302 remote communication package and will be monitored and tracked for performance.
0
This discussion has been closed.
Categories
- All Categories
- 87.7K THE MAIN WALL
- 3.3K A-C, Heat Pumps & Refrigeration
- 59 Biomass
- 430 Carbon Monoxide Awareness
- 127 Chimneys & Flues
- 2.2K Domestic Hot Water
- 5.9K Gas Heating
- 121 Geothermal
- 170 Indoor-Air Quality
- 3.8K Oil Heating
- 79 Pipe Deterioration
- 1.1K Plumbing
- 6.6K Radiant Heating
- 396 Solar
- 16K Strictly Steam
- 3.5K Thermostats and Controls
- 56 Water Quality
- 51 Industry Classes
- 51 Job Opportunities
- 17 Recall Announcements