Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Main Vent Issues
Larry_10
Member Posts: 127
I want to move the rear main vent farther away from the end of the main. It's just four inches away right now.
In order to do this, I will have to take the existing rear vent out of it's sandwiched position on the main which is between a return and a riser. If I do this, the new rear vent will be about 30" from the end of the main.
The boiler is not new, but even to Keyspan's frustration (they want to sell us a new one), it still hums beautifully.
There are 3" mains piped to the boiler. The front main is a bit more than 25' long and the rear main is just over 35'. I spoke to the people at Gorton and they said I could install the big ones, #2's - - one at each end. I have the #2's and nipples that will raise them 8" high on the main. Can I proceed?
Any advice on how to get the drill filings out of the main after I drill and tap? I have some off Dan Holohan's books on steam, but nothing on this.
In order to do this, I will have to take the existing rear vent out of it's sandwiched position on the main which is between a return and a riser. If I do this, the new rear vent will be about 30" from the end of the main.
The boiler is not new, but even to Keyspan's frustration (they want to sell us a new one), it still hums beautifully.
There are 3" mains piped to the boiler. The front main is a bit more than 25' long and the rear main is just over 35'. I spoke to the people at Gorton and they said I could install the big ones, #2's - - one at each end. I have the #2's and nipples that will raise them 8" high on the main. Can I proceed?
Any advice on how to get the drill filings out of the main after I drill and tap? I have some off Dan Holohan's books on steam, but nothing on this.
0
Comments
-
See the other thread
for my answers.
To Learn More About This Professional, Click Here to Visit Their Ad in "Find A Professional"All Steamed Up, Inc.
Towson, MD, USA
Steam, Vapor & Hot-Water Heating Specialists
Oil & Gas Burner Service
Consulting0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 64 Pipe Deterioration
- 917 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements