Still trying to find a home for one of them.

Talk to you later,
Joe

Comments

  • jalcoplumb_2
    jalcoplumb_2 Member Posts: 172
    New munchkin

    Work in progress. 11 cast iron radiators. Removed the 2" mains and installed 1/2" pex to each off a RTI thermallock manifold. Max system temp 170.

    The outside temp was 23 and the inside temp was 68.

    I still don't have a t-stat hooked up it is just running w/outdoor reset. It has run for two days and maintained 68 inside temp.

    The supply temp was 150 return 130. I will lower it because the contractor said it was to hot.
  • Mark Wolff
    Mark Wolff Member Posts: 256
    Brackets?

    What allthread mounting brackets are those? They look good. Good job by the way.
  • jalcoplumb_2
    jalcoplumb_2 Member Posts: 172
    Reposted for Eric.

    It fell of the botom before you got to see it. I will try to get a few new photo's today and post.

    I have the Super Store hooked up and running and the domestic water manifolds installed. I have been away form the job for a few days. Had a couple of emergency calls.

    Joe
  • jalcoplumb_2
    jalcoplumb_2 Member Posts: 172
    hangers

    just a standard split ring hanger w/ ceiling plate.

    joe
  • Justin Gavin
    Justin Gavin Member Posts: 129
    Just Curious

    I didn't see the primary piping really good.
    1. Are those radiators old?
    2. Do you have a Y strainer attached to the Return?
    3. If not you might consider putting one it so you don't clog up the Heat Exchanger.

    Good Luck
    JG