Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
If our community has helped you, please consider making a contribution to support this website. Thanks!
Retrofittting
Options
clammy
Member Posts: 3,242
i would do a 2 pipe for the rads and do a primary secondary pumping for sure if you read up n the munkin you'll see i t needs constant flow through it,s heat exchanger other wise the unit will short cycle goodluck
R.A. Calmbacher L.L.C. HVAC
NJ Master HVAC Lic.
Mahwah, NJ
Specializing in steam and hydronic heating
0
Comments
-
I'm installing a Munchkin with Vision 1 built-in controls in my 1920 craftsman with (tight) crawl space, indirect WH, and I'm using combination baseboard/steel panels. What's the best piping system to use? One pipe? Two pipe? Manifolds?
It seems like to go primary/secondary, I'll need another circulator and a whole extra set of controls. I'm thinking I only need one zone, since the radiators will have control valves on them.0
This discussion has been closed.
Categories
- All Categories
- 87.4K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 61 Biomass
- 429 Carbon Monoxide Awareness
- 120 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.8K Gas Heating
- 115 Geothermal
- 167 Indoor-Air Quality
- 3.7K Oil Heating
- 77 Pipe Deterioration
- 1K Plumbing
- 6.5K Radiant Heating
- 395 Solar
- 15.7K Strictly Steam
- 3.4K Thermostats and Controls
- 56 Water Quality
- 51 Industry Classes
- 50 Job Opportunities
- 18 Recall Announcements