Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

Meeker Mansion Restoration Day 4-7-PGP

Paul Pollets
Paul Pollets Member Posts: 3,664
We've made significant progress in repiping the Basement gravity mains and laterals which needed replacement. We added a Buderus "Solidoflux" wall radiator in the Basement storage area where they keep special woods and moldings and other architectural artifacts. It's sooo nice and cool down there. An arsonist tried to burn the building down in 1991, and there was alot of soot in the lid. Fotunately the fire was put out with min. damage (and the arsonist was caught). Some beams were sandblasted to remove the char. We looked like coal miners after hanging pipe all day.
We decided to relid the ceiling of the mechanical room (360SF) and insulate it with R19 batts. It's now the only insulated room in the building. The sheetrockers come tomorrow. We took delivery of the Viessmann boilers, but we'll do the boiler room at the end of July. Getting the difficult piping finished first, makes it more rewarding to do the easier tasks.
The Pipe and strut hangers are Mupro's latest. We use the Mupro/Rems threaded rod cutter for 3/8 rod for easy assembly. We're using Wirsbo 1/2" MultiCor for radiator supply and returns for its ease of assembly. All the piping will be insulated after commisioning.

<A HREF="http://www.heatinghelp.com/getListed.cfm?id=104&Step=30">To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"</A>

Comments

This discussion has been closed.