5/16 couplings x23
paul lessard_2
Member Posts: 192
when you are on a job keep pressure in pipes at all times,
some people just enjoy messing with other people's stuff.
got razor knife??
some people just enjoy messing with other people's stuff.
got razor knife??
0
Comments
-
5/16 couplings
Nice work Paul. Finally nice to see someone who cares about the way his soldered joints look.....A lot of buffing or are you really that good at it???
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0 -
Nah.....
He gets Nadine to buff those joints... It keeps her busy and outta his hair!!!!
But...... MAYBE she...... did that soldering... bet a woman could make a neater joint anyday!!!!!
:-)0 -
I count 17
We estimated that there was nearly 2 miles of 5/16" hePEXplus in that place but that's a lot of damnage.
Where did you find the leaky tubing?
I'm guessing that most of those were damaged inside of the Q.Track from the Misc. small trade debris from above. Nails,sharps ETC.
Is someone going to get wacked on that job?
G.man0 -
listen all ya all it's sabotage
all holes were made from a razor knife,This tubing was installed early on,it's a good thing I held off on the rest of it...yea 23 couplings no ****.
and those joints are rubbed with a rag only thanks ...
paul maching gun lessard.... ..... ..... ..... .....0 -
listen all ya all it's sabotage
all holes were made from a razor knife,This tubing was installed early on,it's a good thing I held off on the rest of it...yea 23 couplings no shi?.
and those joints are rubbed with a rag only thanks ...
paul machine gun lessard.... ..... ..... ..... .....0 -
sabotage
they were all razor knife holes,all 23 of them.
another wasted day on the job that will not end. thanks those joints were just rubbed with a rag. paul machine gun lessard.... .... .... .... ....0 -
Water test that baby!
I had a similar thing happen to a Warmboard job. Turns out the hardwood installer was cutting his red rosin paper on top of the floor with a razor knife!
Real hard to find knife slits with just an air test.
I ended up replacing several loops to be sure I didn't miss any spots. Not all the cuts went entirely through the tube. That would haunt me forever.
hot rodBob "hot rod" Rohr
trainer for Caleffi NA
Living the hydronic dream0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 917 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements