Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Dual staged/ mini tube

hot_rod
Member Posts: 25,204
will supply a 8800 sq. foot shop and 1200 ft. office. Boilers will be staged with a 262 tekmar. Wirsbo Duo mix will handle the two VS injection pumps. Sealed combustion Crowns, Grundfos Super Brutes with checks to stop flow through the unfired boiler.
1" fiberglass insulation in the dropped ceiling and I'll use yellow, I mean meadowgold :), PVC jacketed 1" Techlite in the mech. room.
I used my REMS bender and swedger to run 120 feet to the remote mini tube in the shop. I've used 2 copper 90's so far, at the manifold.
hot rod
1" fiberglass insulation in the dropped ceiling and I'll use yellow, I mean meadowgold :), PVC jacketed 1" Techlite in the mech. room.
I used my REMS bender and swedger to run 120 feet to the remote mini tube in the shop. I've used 2 copper 90's so far, at the manifold.
hot rod
Bob "hot rod" Rohr
trainer for Caleffi NA
Living the hydronic dream
trainer for Caleffi NA
Living the hydronic dream
0
Comments
-
My electrician
can't bend that well, and he uses a tape mesure. Nice work. Murph is on a picture edicate campaign, look out.
Mark
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0
This discussion has been closed.
Categories
- All Categories
- 86.9K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 57 Biomass
- 425 Carbon Monoxide Awareness
- 110 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.7K Gas Heating
- 106 Geothermal
- 160 Indoor-Air Quality
- 3.6K Oil Heating
- 70 Pipe Deterioration
- 978 Plumbing
- 6.3K Radiant Heating
- 387 Solar
- 15.4K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 44 Industry Classes
- 47 Job Opportunities
- 18 Recall Announcements