Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

Installing a basement radiator

Hi folks, the owner of a ranch house has added a bathroom to the unfinished, unheated basement, and would like to install heat in the new bathroom. Heat to the house is supplied by a diverter T hot water system, pump away, 1 inch supply main, 1/2 inch branch connections to 7 cast iron baseboard radiators, with diverter Ts on the return side, serving the main floor. I was going to recommend that a 6 foot cast iron baseboard radiator be installed in the basement bathroom.
Will 2 diverter Ts cut into the 1 inch main loop serving ½ inch supply lines work for this application, or should a new zone be added to the boiler (Utica USC4 w/ taco 007 circulator)? The supply line from the main would be 4 feet horizontal and 7 feet vertical (down), and the return from the radiator would be 7 feet vertical (up) and 20 feet horizontal. Thankx.

Comments

This discussion has been closed.