Had to work a Weil (hr)

hot_rod
hot_rod Member Posts: 23,184
To fit this into the 42" mechanical space the architect allowed. The boiler feeds into a 6 gallon buffer, much smaller than I had planed.

The VS injection pump pulls from the buffer for the 108 degree slab zones. A Grundfos Mixi Miser will bolt into the assembly. A RTI setpoint control will run the boiler 135- 175. The boiler and indirect pumps are Grundfos check pumps for prioritized DHW, without running through the buffer.

The indirect will slide out by removing some flange and union connections. Unfortunatly the buffer is imprisoned under the boiler stand. The indirect would have to be removed to replace the buffer.

hot rod

<A HREF="http://www.heatinghelp.com/getListed.cfm?id=144&Step=30">To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"</A>
Bob "hot rod" Rohr
trainer for Caleffi NA
Living the hydronic dream

Comments

  • Bill NTSG
    Bill NTSG Member Posts: 321
    I can see....

    that you have been using your new bender and your T-drill.I think if I ever win the Lotto I would be willing to pay you just to take me to work with you. You do some neat projects.
  • tombig
    tombig Member Posts: 291
    Cool Tools

    T Drill?........I must have missed that one. Nice job hr. I love those 'ship in a bottle' installs
  • David Van Wickler
    David Van Wickler Member Posts: 35
    Wide differential

    Thank God somebody used one before I died.
  • hot_rod
    hot_rod Member Posts: 23,184
    Thanks guys

    I was thinking about Ron Jr on this job! You really have to plan out every fitting and pipe path to "make it fit" and make it serviceable in these tight installs. Hard to believe in this new construction "age" that adequate room can't be found somehow.

    hot rod

    To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"
    Bob "hot rod" Rohr
    trainer for Caleffi NA
    Living the hydronic dream
  • Too bad

    they don't make an indirect with two tanks for these kind of situations. Viessmann makes a "bivalent" indirect that has two separate heat exchangers; the additional HX could be used for a small radiant zone.

    Looks as though you didn't have a chance to talk to the AIA in the planning stages; they always imagine our equipment is small and doesn't need any additional space for servicing.

    Nice work, hot "squeeze it in" rod.

    Alan

    To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"