MY FIRST BUDERUS INSTALL
jim f
Member Posts: 182
here is my first twin buderus install. will be firing them in the morning. these are two 215/6oil fired boilers heating 7 air handlers,garage unit heater, a 100 gallon indirect and a future 2 zone baseboard for basement.the 1 1/4 pipe (2nd from right)is a primary/secondary sysyem to attic feeding 3 air handlers. staging boilers on a tekmar 262 with outdoor reset. it also takes core of the domestic hot water. the others are controled by a argo 6 zone circulator board.
jim f.
milford, ct.
jim f.
milford, ct.
0
Comments
-
another view
0 -
VERY NICE JIM!!!!
That is a very professional looking install.
You should be very proud!!
Mark H
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0 -
Sweet job jim !!!!!!
Thats a great looking job Jim, shows you love your work, hope your teachin some one else along the way... David Sutton0 -
Great work again , Jim
Are 2 boiler systems your specialty ? You seem to do alot of em . What type of burners are in the boilers ? Beautiful job .0 -
Am I too
old to say "COOL"? Naah-COOL.0 -
2 boilers
we oversize our boilers a lttle to accomadate future additions and the main reason is if one boiler goes down the other is able to handle 2/3's of the load. the burners are beckett
jim f.0 -
All I can say is WOW. Great job!0 -
Nice job
We have used the 215 series but not that big. What model Beckett is that with the cover? How long did it take to pipe the boilers up? One (humble) suggestion, pipe the elec and oil line on the same side as the door hinges it makes cleaning and inspection a breeze.0 -
beatiful work Jim
I am curious, why did you choose the tekmar control over the Buderus control? You could have added a staging card, and also a mixing card to get multiple water temps, outdoor reset, domestic hot water priority and stage firing?
Chuck Shaw
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0 -
Nice Job But...
Jim Nice job but it would have been nice to put flex lines on the oil lines feeding the burner so you wouldn't have to disconnect them when cleaning the boiler and have the wire feeding the burners just a little longer. From the picture it looks like it is going to be a little tight opening the doors. other than that looks great!
John Jr0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 915 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements