Fusion Hydronics (hr)
hr
Member Posts: 6,106
This system incorporates a Superstore buffer tank. The buffer aquastat will call the boiler on and run a 140- 180 (40 degree delts T) maybe more :) Grundfos Super Brute 15-58 check pumps keeping everything going the right direction when the DHW priortizes via the Crown intergral circuit board.
A post purge relay will suck the BTUs out of the boiler after a call is complete, and shove them into the buffer tank.
If RB would stop shooting and start soldering I would have the correct 5 zone ZCP with 4 way mix and reset control that runs off the buffer tank, for this 5 zone gypcrete job.
The scaffold allows my to "mock up" the job room and allows easy roll around "prefabbing" I'll pressure test and run the whole package before I haul it to the job.
hot rod
<A HREF="http://www.heatinghelp.com/getListed.cfm?id=144&Step=30">To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"</A>
A post purge relay will suck the BTUs out of the boiler after a call is complete, and shove them into the buffer tank.
If RB would stop shooting and start soldering I would have the correct 5 zone ZCP with 4 way mix and reset control that runs off the buffer tank, for this 5 zone gypcrete job.
The scaffold allows my to "mock up" the job room and allows easy roll around "prefabbing" I'll pressure test and run the whole package before I haul it to the job.
hot rod
<A HREF="http://www.heatinghelp.com/getListed.cfm?id=144&Step=30">To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"</A>
0
Comments
-
Ya know.........
The hydronic art is limited only by a guys imagination. As yours must be running at warp factor 7 all the time Hot Rod.
Nice, REAL Nice!0 -
> This system incorporates a Superstore buffer
> tank. The buffer aquastat will call the boiler
> on and run a 140- 180 (40 degree delts T) maybe
> more Grundfos Super Brute 15-58 check pumps
> keeping everything going the right direction when
> the DHW priortizes via the Crown intergral
> circuit board.
>
> A post purge relay will suck
> the BTUs out of the boiler after a call is
> complete, and shove them into the buffer
> tank.
>
> If RB would stop shooting and start
> soldering I would have the correct 5 zone ZCP
> with 4 way mix and reset control that runs off
> the buffer tank, for this 5 zone gypcrete
> job.
>
> The scaffold allows my to "mock up" the
> job room and allows easy roll around "prefabbing"
> I'll pressure test and run the whole package
> before I haul it to the job.
>
> hot rod
>
> _A
> HREF="http://www.heatinghelp.com/getListed.cfm?id=
> 144&Step=30"_To Learn More About This Contractor,
> Click Here to Visit Their Ad in "Find A
> Contractor"_/A_
0 -
mega short
Make sure the guy that sized the Mega didn't get his gal/minute and gal/hours recovery mixed up. Showed a friend how to add a brazed plate so the HO could fill his hot tub. The specs I read on the Mega were not to great for recovery time. Nice place to work, nothing worse than doing it on the floor, and I'm to old for that.0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 913 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements