potable H2O heating;parallel reverse return?
copperhead
Member Posts: 8
last year at some point some helpful fella posted 3 drawings of different ways to pipe multiple indirect-fired H2O heaters,which I promptly archived. since then I've moved and for some reason,so has that document. it had one undesirable layout ; the typical time and material consuming tiered "menorah" ; and what I believe was called the parallel reverse return,by far the simplest and reportedly the best method. could someone either draw it again or refer me to a source where I can see a drawing? preferably done by someone with a bunch of letters after their name,because the powers that be will be more receptive with all those letters. There has to be a better way than that "menorah" style. There has to be a name for that too. What's it called besides a pain in the neck? Help,before I'm forced to pipe it like that again. egads.....( I didn't find it in Siegenthaler's book...) thanks folks.
0
Comments
-
Did you...
try a search on the site . Put in "key words" and I've dragged out some of the past without too much trouble . Good luck! Chris.0 -
That was ME I'll bet
He will be by again, and repost for you.
hot rod
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0 -
Hi Copperhead
This is parallel reverse return in it's simplest form. Sorry I couldn't make it smaller, am in a hurry to go pick my Mom up from the airport.
M. E. Will be along shortly.
Good luck, fella.
Brian in Swampland.0 -
Parallels
Ask and ye shall receive......
BTW, Thank HR for finding out about being able to get your whole album from a previous photo posting web site(PhotoPoint.com}, or we'd all be wondering what it looked like. Thanks for the heads up HR.
ME
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0 -
Yeah, Mark
That's what I meant ;O)
I knew you'd come to the rescue, thanks.
Brian (Tankless) Wood.0 -
parallel:that's what I'm talking about!...BUT...
Thanks ME for the concise cartoon so quickly rendered....but in order for me to get my employers to change their bad habits I still need another source/s with "official credentials" for them to even look up from whatever it is that they're doing. Books,publications,whathaveyou...I just finished installing two 120 gal. Phase 3 tanks w/provisions for a third,top tapping {aarrg!} in 3" & 2 1/2" copper Victaulic,that whole tiered menorah , hung from the cieling on the horizontal...so much unistrut and rod and Vic stuff...and it won't work properly anyways,{another long story,alas}. once more...stop me before I butcher it AGAIN!!! thanks a MBTU/H rk0 -
Try John Siegenthaler....
his email address is johnsiegen@aol.com
I'm sure he would confirm my recommendations.
G'Luck!!
ME
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 913 Plumbing
- 6K Radiant Heating
- 380 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements