Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
First time injection
Patrick_3
Member Posts: 20
I am considering my first "injection" system vs mixing valve. I have 4(110 degree)radiant zones and now we have added a baseboard zone "bonus room" and a boiler mate(180 degree). I will be using a Munchkin 140,000 btu boiler. Munchkin is talking of having a new circuit board that will control two temp systems but I have not seen it yet. I will use a tekmar 356 or 361 (variable speed injection). My concern is building the injection loop, flow controls, press valves, backflow ect. Any in put?? Thanks in advance. Patrick
0
Comments
-
Injection
John Siegenthaler writes many articles on injection piping for P & M magazine. Check through his archives at this link:
http://www.pmmag.com/
The tekmar literature has piping instructions as well.
To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"0 -
The answers
open attachment
this works!
al
0
This discussion has been closed.
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 916 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements