another boiler job - jim f.

Options
JIM F.
JIM F. Member Posts: 82
here are some pics of a new installation we did at the end of last week.

Comments

  • JIM F.
    JIM F. Member Posts: 82
    Options
    another boiler

    sorry about the size.
  • hr
    hr Member Posts: 6,106
    Options
    Just wondering, Jim

    why you have iso valves below the pumps? If you were to put the iso valves above the flow checks and one 1-1/4 ball valve before the air purger you could isolate every single component in the system that may, or will, need service someday. Everything from the expansion tank through to the flow checks would be between ball valves. An old Holohan trick!

    Do those weighted flow checks hold well enough to change a pump out?

    I use a 1-1/4" Jomar filter ball valve just before the purger which also gives me a strainer to protect the pumps from solder balls, etc.

    Real nice work you do.

    hot rod


    To Learn More About This Contractor, Click Here to Visit Their Ad in "Find A Contractor"
  • Frank_5
    Frank_5 Member Posts: 49
    Options
    Small pipe

    Very nice, very neat. I'm half way into a twin 250 HP steam job. 10" header; 6" equalizer; 24" flue; etc. Now that's turning out to be a PIPING job.
This discussion has been closed.