Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
boiler install in progress - jim f.
JIM F.
Member Posts: 82
heres a job we started yesterday and 1/2 day today. nice local job. 2 blocks from my homestead. here are some shots in progress. tryed to take many pictures in small stages to put in a slide show. but have to get a tripod or some thing to keep pics in alignment. next job i guess. well here are some stages. well finish up in a.m. . oh yea, the drain valve and the press/rel valve need to be swiched on the phase 3. had no room on floor for x-tank so built a rack on the wall. on the left of the supply manifold there will be an air handler heating/cooling the basement area. the trunk will come over the mech room(18x6) so i have to keep a path clear with the piping aragement. not a finished product yet but soon. i'll post finished pictures.
jim f.
milford,ct.
jim f.
milford,ct.
0
Comments
-
Great work in a tight spot
Thats gotta be a one man job in that cubby hole .0 -
i would jump in take some measurements and go cut ,clean **** and setup. we switch, then my helper threads,builds and levels maniflold than switch.i jump in put some pices in solder clean joints and switch and switch and switch. nice day -music-view of long island sound(from ct side). close to home-
take these days when you get um!!
jim f.0
This discussion has been closed.
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 52 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 913 Plumbing
- 6K Radiant Heating
- 380 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements