The 2 vertical pipes are supply lines hooked up to the main return line. Also the 2- 3/4 to 1" return lines up on the ceiling are return lines as well from the radiators that run to a trap. Is this correct?
Weil McLain EG-50-PI 175000 2 pipe Steam Boiler Vacuum System. Installed 12/13/91..
0
Comments
-
Can't see enough to tell but probably OK
0 -
"Is it correct?" How are things running?
0 -
Seems to be running ok. The pipe on the left is 1 loop and the right another loop, so I guess it is correct. End of loops dumping to the return?
Weil McLain EG-50-PI 175000 2 pipe Steam Boiler Vacuum System. Installed 12/13/91..
0
Categories
- All Categories
- 86.7K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 55 Biomass
- 423 Carbon Monoxide Awareness
- 102 Chimneys & Flues
- 2K Domestic Hot Water
- 5.6K Gas Heating
- 102 Geothermal
- 158 Indoor-Air Quality
- 3.5K Oil Heating
- 68 Pipe Deterioration
- 935 Plumbing
- 6.2K Radiant Heating
- 385 Solar
- 15.3K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 43 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements