Drawing
Drainage:
Building Drain should exit to the left hand side of page.
The 3pc bathroom group and the kitchen sink and floor drain are to be separate wet vented groups.
The 2pc bathroom on the upper left hand side should be wet vented through a stack.
The remaining drainage can be attached as you see fit, provided no code violations occur.
Venting:
Vents from the first floor will have a T.D.L. of 14m
Vents from the second floor will have a TDL of 10m
Vents from the third floor will have a TDL of 6m
Cleanouts:
All required cleanouts should be identified and the size noted
Use Proper Colour Code:
Drainage = Red
Wet Vent = Blue
Venting = Green
Distances:
You may assume any distances that you wish as long as they are noted on the drawing if applicable to code violations.
Stacks:
You must use at least 2 stacks.
Comments
-
-
similar to previous thread he posted. Generated several inputs from group but OP never responded.
0
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 916 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements