Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Tekmar 261 2 stage boiler

BDP1858
Member Posts: 1
I have a question about wiring the pumps for the Tekmar 261 I will be installing. I have 2, 199 natural gas, natural draft burnhams injecting into the system loop using primary secondary. Since there is only one pump contact on the controller, do I need to just have all 3 pumps (both boiler pumps, and system pump) going at the same time off the Tekmars call for heat? Instead of wiring the boiler pumps to each boiler. I’m thinking if I don’t, once the tekmar has reached its set point, it will just shut the boiler off completely and leave no way for the boiler pump to purge. Alternatively, is there a post purge on the Burnhams even if the call for heat stops while the boiler is firing?
0
Categories
- All Categories
- 86.9K THE MAIN WALL
- 3.2K A-C, Heat Pumps & Refrigeration
- 57 Biomass
- 425 Carbon Monoxide Awareness
- 109 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.7K Gas Heating
- 105 Geothermal
- 160 Indoor-Air Quality
- 3.6K Oil Heating
- 70 Pipe Deterioration
- 975 Plumbing
- 6.3K Radiant Heating
- 386 Solar
- 15.4K Strictly Steam
- 3.4K Thermostats and Controls
- 54 Water Quality
- 44 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements