Tekmar 261 2 stage boiler
Options
BDP1858
Member Posts: 1
I have a question about wiring the pumps for the Tekmar 261 I will be installing. I have 2, 199 natural gas, natural draft burnhams injecting into the system loop using primary secondary. Since there is only one pump contact on the controller, do I need to just have all 3 pumps (both boiler pumps, and system pump) going at the same time off the Tekmars call for heat? Instead of wiring the boiler pumps to each boiler. I’m thinking if I don’t, once the tekmar has reached its set point, it will just shut the boiler off completely and leave no way for the boiler pump to purge. Alternatively, is there a post purge on the Burnhams even if the call for heat stops while the boiler is firing?
0
Categories
- All Categories
- 87.5K THE MAIN WALL
- 3.3K A-C, Heat Pumps & Refrigeration
- 61 Biomass
- 430 Carbon Monoxide Awareness
- 122 Chimneys & Flues
- 2.1K Domestic Hot Water
- 5.9K Gas Heating
- 117 Geothermal
- 170 Indoor-Air Quality
- 3.8K Oil Heating
- 78 Pipe Deterioration
- 1K Plumbing
- 6.6K Radiant Heating
- 395 Solar
- 15.9K Strictly Steam
- 3.5K Thermostats and Controls
- 57 Water Quality
- 51 Industry Classes
- 51 Job Opportunities
- 18 Recall Announcements