Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Max Length of Supply/Return Legs for Panel Rads - Two Pipe Reverse Return
NTL1991
Member Posts: 104
Hey guy, I've been reading Dan's books on Pumping Away, and Primary Secondary Piping. I'm curious if there are any rules-of-thumb about how long supply and return legs for a panel rad can be coming off 2-pipe reverse return mains.
If a 2-pipe reverse return main was looped around the basement, would it be possible to shoot each radiator's supply and return legs two, possibly three floors up? I'd imagine filling and bleeding a system like this would be a challenge?
If a 2-pipe reverse return main was looped around the basement, would it be possible to shoot each radiator's supply and return legs two, possibly three floors up? I'd imagine filling and bleeding a system like this would be a challenge?
Nick, Cranston, RI
0
Comments
Categories
- All Categories
- 86.5K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 423 Carbon Monoxide Awareness
- 95 Chimneys & Flues
- 2K Domestic Hot Water
- 5.5K Gas Heating
- 101 Geothermal
- 156 Indoor-Air Quality
- 3.5K Oil Heating
- 64 Pipe Deterioration
- 927 Plumbing
- 6.1K Radiant Heating
- 384 Solar
- 15.1K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 48 Job Opportunities
- 17 Recall Announcements