Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.

feeding with a MM67, new install

GW
GW Member Posts: 4,821
So I finally have a boiler with a MM67 and I need to feed it, anyone have a good-better-best way to do this? A few weeks ago I had issues with overfilling and @Steamhead gave me some tips. This is a little different- when i set up the TDC should i just change the circuit to 24V and do a 24v feeder? Running a TDC with line seems more cumbersome. Thanks for any comments
Gary Wilson
Wilson Services, Inc
Northampton, MA
gary@wilsonph.com

Comments

  • Steamhead
    Steamhead Member Posts: 17,358
    If the 67 is wired 120V, I'd use a VXT-120, add the necessary switched wire back to the junction box and run a 3-wire BX cable from there to the VXT.
    All Steamed Up, Inc.
    Towson, MD, USA
    Steam, Vapor & Hot-Water Heating Specialists
    Oil & Gas Burner Service
    Consulting
  • GW
    GW Member Posts: 4,821
    Ok cool so yes or no on the time delay? Or, is it the SG400 that requires the TDC?
    Gary Wilson
    Wilson Services, Inc
    Northampton, MA
    gary@wilsonph.com
  • GW
    GW Member Posts: 4,821
    I think I’m confused. A few weeks ago it was new style low-water cut off with oldschool Feeder, this time it’s old style LWCO with the new feeder. Got it. I’m making it more complicated than it is thanks for the advice
    Gary Wilson
    Wilson Services, Inc
    Northampton, MA
    gary@wilsonph.com