Degree of boiler floor level?
Rincon
Member Posts: 1
Hi folks -
I'm in the middle of a new WM steam boiler installation. Contractor is a respected outfit for steam heat, skilled crew, but they mentioned something about the pad level looking a little off. They'll be back tomorrow to finish the installation including the near piping but going down to check it out in detail this evening there's a 5/8" tilt towards the water feeder side. Is there a rule of thumb on how level this needs to be?
For all I know, they plan to remedy it in the morning, but I'd really like to have an idea of whether this tilt is within reason or if I need to fall on my sword for this since this is a (hopefully) one-in-several-decade process. And, if it's too much tilt, I'd sure like to nip it in the bud before the installation is finished. Similarly, what's the consensus on [metal] shimming it?
I'm in the middle of a new WM steam boiler installation. Contractor is a respected outfit for steam heat, skilled crew, but they mentioned something about the pad level looking a little off. They'll be back tomorrow to finish the installation including the near piping but going down to check it out in detail this evening there's a 5/8" tilt towards the water feeder side. Is there a rule of thumb on how level this needs to be?
For all I know, they plan to remedy it in the morning, but I'd really like to have an idea of whether this tilt is within reason or if I need to fall on my sword for this since this is a (hopefully) one-in-several-decade process. And, if it's too much tilt, I'd sure like to nip it in the bud before the installation is finished. Similarly, what's the consensus on [metal] shimming it?
0
Comments
-
The boiler should be level. Shim it as needed.All Steamed Up, Inc.
Towson, MD, USA
Steam, Vapor & Hot-Water Heating Specialists
Oil & Gas Burner Service
Consulting3 -
Use aluminum shims so rust won't be an issue.
BobSmith G8-3 with EZ Gas @ 90,000 BTU, Single pipe steam
Vaporstat with a 12oz cut-out and 4oz cut-in
3PSI gauge0 -
I use plastic shims from Amazon, but shims will do. When you install steam boilers, -a level surface is a real luxury.
Dirt with rocks is kind of normal....New England SteamWorks
Service, Installation, & Restoration of Steam Heating Systems
newenglandsteamworks.com0 -
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 916 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements