Mechanical room finally completed.

EzzyT
EzzyT Member Posts: 1,342
We did the plumbing and heating at this 9000 square foot house. Finally got the mechanical completed, up and running and balanced.
1-zone of radiant and 12 zones of baseboard.
I love the Caleffi products Ive been installing there products for years and to me its a no brainer. Hot Rod, thanks again.
The Builder/home owner was shocked on how small the boiler was and Im guessing he's never seen a modcon boiler before.
We prefab the one 4'x8' sheet of plywood with all zone valves and Alpha pumps at the shop made the job a lot easier and plenty of room to work with.


E-Travis Mechanical LLC
Etravismechanical@gmail.com
201-887-8856
Harvey RamerlchmbChrisJ

Comments

  • hvacfreak2
    hvacfreak2 Member Posts: 500
    Man that is beautiful.
    hvacfreak

    Mechanical Enthusiast

    Burnham MST 396 , 60 oz gauge , Tigerloop , Firomatic Check Valve , Mcdonnell Miller 67 lwco , Danfoss RA2k TRV's

    Easyio FG20 Controller

  • EzzyT
    EzzyT Member Posts: 1,342
    Thanks. It been a really long time since I had a whole mechanical room to myself which made the job so much easier and not have to fight for space
    E-Travis Mechanical LLC
    Etravismechanical@gmail.com
    201-887-8856
  • hot_rod
    hot_rod Member Posts: 23,211
    Wow! excellent work, how many hours in that room? Thank for the Caleffi support.

    Be sure to enter it in the Excellence program.

    http://www.caleffiexcellence.com
    Bob "hot rod" Rohr
    trainer for Caleffi NA
    Living the hydronic dream
  • EzzyT
    EzzyT Member Posts: 1,342
    Thanks Hot Rod I sure will enter it in the Caleffi excellence program. We prefab that one sheet in about 8 hours at the shop and once everything was transfords over to te job it took about 40 hours to complete everything that includes all the wiring and fine tuning and balancing the flow rates on the radiant manifold, quickseters on the hot water recirc
    E-Travis Mechanical LLC
    Etravismechanical@gmail.com
    201-887-8856
  • Danny Scully
    Danny Scully Member Posts: 1,437
    12 zones of baseboard? Couldn't sell them on cast iron rads? :wink: Mechanical room looks awesome!
  • EzzyT
    EzzyT Member Posts: 1,342
    yeah I know. We tried selling them more zones of radiant and wall hung panel rads for the rest of the house but builder just wanted the most simple kinda hydronic system. Thanks.
    E-Travis Mechanical LLC
    Etravismechanical@gmail.com
    201-887-8856
  • NYplumber
    NYplumber Member Posts: 503
    Nice work. Always rewarding when the prefabricated work fits well.
    :NYplumber:
  • EzzyT
    EzzyT Member Posts: 1,342
    Thanks
    E-Travis Mechanical LLC
    Etravismechanical@gmail.com
    201-887-8856
  • Cody350
    Cody350 Member Posts: 11
    Nice Work Ezzy!

    After speaking with you many times about your work it's good to finally see it.
    Cody Mack
    Caleffi North America
  • EzzyT
    EzzyT Member Posts: 1,342
    Thanks Cody much appreciated.
    E-Travis Mechanical LLC
    Etravismechanical@gmail.com
    201-887-8856
  • jonny88
    jonny88 Member Posts: 1,139
    Beautiful work.Amazed the GC didn't listen to you in regards to panel rads at least.Not a deal breaker when he invested so much in boiler room.Thznks for sharing
  • EzzyT
    EzzyT Member Posts: 1,342
    Thanks. Yeah I know but I'm not complaining I'm glad he went with hydronics rather then forced air