Mechanical room finally completed.
EzzyT
Member Posts: 1,342
We did the plumbing and heating at this 9000 square foot house. Finally got the mechanical completed, up and running and balanced.
1-zone of radiant and 12 zones of baseboard.
I love the Caleffi products Ive been installing there products for years and to me its a no brainer. Hot Rod, thanks again.
The Builder/home owner was shocked on how small the boiler was and Im guessing he's never seen a modcon boiler before.
We prefab the one 4'x8' sheet of plywood with all zone valves and Alpha pumps at the shop made the job a lot easier and plenty of room to work with.
1-zone of radiant and 12 zones of baseboard.
I love the Caleffi products Ive been installing there products for years and to me its a no brainer. Hot Rod, thanks again.
The Builder/home owner was shocked on how small the boiler was and Im guessing he's never seen a modcon boiler before.
We prefab the one 4'x8' sheet of plywood with all zone valves and Alpha pumps at the shop made the job a lot easier and plenty of room to work with.
3
Comments
-
Man that is beautiful.hvacfreak
Mechanical Enthusiast
Burnham MST 396 , 60 oz gauge , Tigerloop , Firomatic Check Valve , Mcdonnell Miller 67 lwco , Danfoss RA2k TRV'sEasyio FG20 Controller
0 -
Thanks. It been a really long time since I had a whole mechanical room to myself which made the job so much easier and not have to fight for space0
-
Wow! excellent work, how many hours in that room? Thank for the Caleffi support.
Be sure to enter it in the Excellence program.
http://www.caleffiexcellence.comBob "hot rod" Rohr
trainer for Caleffi NA
Living the hydronic dream0 -
Thanks Hot Rod I sure will enter it in the Caleffi excellence program. We prefab that one sheet in about 8 hours at the shop and once everything was transfords over to te job it took about 40 hours to complete everything that includes all the wiring and fine tuning and balancing the flow rates on the radiant manifold, quickseters on the hot water recirc0
-
12 zones of baseboard? Couldn't sell them on cast iron rads? Mechanical room looks awesome!0
-
yeah I know. We tried selling them more zones of radiant and wall hung panel rads for the rest of the house but builder just wanted the most simple kinda hydronic system. Thanks.0
-
Nice work. Always rewarding when the prefabricated work fits well.:NYplumber:0
-
-
Nice Work Ezzy!
After speaking with you many times about your work it's good to finally see it.Cody Mack
Caleffi North America0 -
-
Beautiful work.Amazed the GC didn't listen to you in regards to panel rads at least.Not a deal breaker when he invested so much in boiler room.Thznks for sharing0
-
Thanks. Yeah I know but I'm not complaining I'm glad he went with hydronics rather then forced air1
Categories
- All Categories
- 86.2K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 99 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 63 Pipe Deterioration
- 915 Plumbing
- 6K Radiant Heating
- 381 Solar
- 14.8K Strictly Steam
- 3.3K Thermostats and Controls
- 53 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements