Before/After Steam
Dan Foley
Member Posts: 1,266
Poppy and Brian knocked this one out earlier this week. A one pipe system with a 45-year old American Standard gas boiler.
0
Comments
-
After. We replaced it with a Crown Bermuda.0
-
-
Out of curiosity, what's the nipple coming (vertically) before the relief valve. Is it a chemical adding station?0
-
-
Beautiful!0
-
Superb, Dan. Thanks for sharing.Retired and loving it.0
-
Nice install Dan. I am curious about the cement work. How do you pour a cement slab on a retrofit job and not waste time waiting for it to dry? After all the customer needs heat.:NYplumber:0
-
We use quick-set cement and pour the housekeeping pad immediately after demo. The boiler is piped to the side while it sets up.
By afternoon, we can set the boiler on the pad and continue piping. The second day is for trim out, controls, wiring and cleaning/skimming. I figure two days for a change-out and price accordingly.
We got lucky on this one - the weather was mild and the house had a heat pump system in an addition to provide residual heat.2 -
Thanks for the info Dan:NYplumber:0
Categories
- All Categories
- 86.5K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 423 Carbon Monoxide Awareness
- 96 Chimneys & Flues
- 2K Domestic Hot Water
- 5.5K Gas Heating
- 101 Geothermal
- 157 Indoor-Air Quality
- 3.5K Oil Heating
- 64 Pipe Deterioration
- 928 Plumbing
- 6.1K Radiant Heating
- 384 Solar
- 15.1K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 42 Industry Classes
- 48 Job Opportunities
- 17 Recall Announcements