Welcome! Here are the website rules, as well as some tips for using this forum.
Need to contact us? Visit https://heatinghelp.com/contact-us/.
Click here to Find a Contractor in your area.
Before/After Steam
Dan Foley
Member Posts: 1,265
Poppy and Brian knocked this one out earlier this week. A one pipe system with a 45-year old American Standard gas boiler.
0
Comments
-
After. We replaced it with a Crown Bermuda.0
-
-
Out of curiosity, what's the nipple coming (vertically) before the relief valve. Is it a chemical adding station?0
-
-
Beautiful!0
-
Superb, Dan. Thanks for sharing.Retired and loving it.0
-
Nice install Dan. I am curious about the cement work. How do you pour a cement slab on a retrofit job and not waste time waiting for it to dry? After all the customer needs heat.:NYplumber:0
-
We use quick-set cement and pour the housekeeping pad immediately after demo. The boiler is piped to the side while it sets up.
By afternoon, we can set the boiler on the pad and continue piping. The second day is for trim out, controls, wiring and cleaning/skimming. I figure two days for a change-out and price accordingly.
We got lucky on this one - the weather was mild and the house had a heat pump system in an addition to provide residual heat.2 -
Thanks for the info Dan:NYplumber:0
Categories
- All Categories
- 86.3K THE MAIN WALL
- 3.1K A-C, Heat Pumps & Refrigeration
- 53 Biomass
- 422 Carbon Monoxide Awareness
- 90 Chimneys & Flues
- 2K Domestic Hot Water
- 5.4K Gas Heating
- 100 Geothermal
- 156 Indoor-Air Quality
- 3.4K Oil Heating
- 64 Pipe Deterioration
- 917 Plumbing
- 6.1K Radiant Heating
- 381 Solar
- 14.9K Strictly Steam
- 3.3K Thermostats and Controls
- 54 Water Quality
- 41 Industry Classes
- 47 Job Opportunities
- 17 Recall Announcements